22–24 Sept 2015
ESA/ESTEC
Europe/Amsterdam timezone

Session

SpW Simulation, Test, and Verification

22 Sept 2015, 16:15
Einstein (ESA/ESTEC)

Einstein

ESA/ESTEC

Keplerlaan 1 2201AZ Noordwijk ZH The Netherlands

Conveners

SpW Simulation, Test, and Verification

  • Yuriy SHEYNIN (St. Petersburg University of Airospace Instrumentation)

Description

This session will be dedicated to the test, verification and simulation tools and requirements.

Presentation materials

There are no materials yet.

  1. Mr Matthias Beer (Rohde&Schwarz GmbH & Co KG)
    22/09/2015, 16:15
    SpW Simulation, Test, and Verification
    Presentation
    This presentation shows the most recent aspects how to synchronize on very long and continuous SpaceWire data streams without gaps and synchronization patterns. In addition, the presentation shows how to trigger and decode a SpaceWire data stream with an oscilloscope.
    Go to contribution page
  2. Mr Paul Walker (4Links Limited)
    22/09/2015, 16:45
    SpW Simulation, Test, and Verification
    4Links will introduce the concept of SpaceWire Satellite Development Systems, together with brief descriptions of the first products. These will include the basic elements needed to build a model of the SpaceWire network on a proposed satellite: a single-board computer, a routing switch, and a bridge from SpaceWire to Ethernet to represent a link to the ground. They will also include a remote...
    Go to contribution page
Building timetable...