22–24 Sept 2015
ESA/ESTEC
Europe/Amsterdam timezone

Session

SpW- and SpFi-related components

24 Sept 2015, 09:00
Einstein (ESA/ESTEC)

Einstein

ESA/ESTEC

Keplerlaan 1 2201AZ Noordwijk ZH The Netherlands

Conveners

SpW- and SpFi-related components

  • Giorgio Magistrati (ESA/Data Systems Division)

SpW- and SpFi-related components: Continued

  • Giorgio Magistrati (ESA/Data Systems Division)

Description

This session will be dedicated to SpaceWire-related components: SpW End-Points (network interfaces), SpW Switches, System-on-chips, boards, units, etc.

Presentation materials

There are no materials yet.

  1. Mr Albert Ferrer (Star Dundee), Dr Alberto Gonzalez Villafranca (STAR-Dundee Ltd), Prof. Steve Parkes (University of Dundee)
    24/09/2015, 09:00
    SpW Evolutions including ECSS-ST-50-12C Rev.1, SpW Handbook, SpaceFibre and SpW 2
    Presentation
    STAR-Dundee Ltd working in close collaboration with Microsemi hasimplemented both SpaceWire and SpaceFibre on the new RTG4 FPGA. This demonstration will show SpaceFibre running at 2.5 Gbits/s between two RTG4 devices and to other equipment. It will also demonstrate SpaceWire running over SpaceFibre.
    Go to contribution page
  2. Mr Grishin Viacheslav (Scientific Research Institute "Submicron")
    24/09/2015, 09:35
    SpW Components
    Presentation
    Independent development implementation of IP-cores- Codec Giga Space Wire on the basis of the standard’s draft SpaceWire-ENG Health check of the project at the lab bench Interoperability test with other implementations of Giga Space Wire (to be fullfilled)
    Go to contribution page
  3. Prof. Seisuke Fukuda (JAXA)
    24/09/2015, 09:50
  4. Mr Florent Mettendorff (Axon' Cable Ltd), Mr Kevin Enouf (Axon' Cable SAS (Axo.com)), Mr Stephane Hermant (Axon' Cable SAS (Axo.com))
    24/09/2015, 11:00
    SpW Components
    Presentation
    I. INTRODUCTION Under the ESA Technology Research Program (TRP), contract n° AO/1-7985/14/NLSW, Axon’ Cable is working as a prime on the development of a compact impedance matched connector for SpaceWire links in partnership with Star-Dundee. Connectors as per ESCC 3401/071 asked by ECSS-E-ST-50-12C are not ESCC qualified and do not offer optimal inner shield termination compatible with...
    Go to contribution page
Building timetable...